For the complete documentation index, see llms.txt. This page is also available as Markdown.

Publish and go live

Move a study from Draft to Testing to Live, understand what each status allows, publish changes safely, and close a study.

A study moves through statuses: Draft while you build, Testing while you check it, Live while real participants take part, and finally Closed. Changing status publishes the study for you. This page explains each status, the checks Yazi runs before launch, and how to change a study that is already live.

In short:

  • The path is Draft, then Testing (Move to testing), then Live, then Closed (Manage study > Close). Moving into Testing or Live publishes the study automatically; there is no separate publish step.

  • After that, a Publish changes button appears only when you have edited something that participants are not seeing yet. The status shows Live · not published until you publish.

  • On a live study, new questions only reach people who have not passed that point, and deleting a question deletes the answers already collected for it. Pause, edit, then resume.

What each status means

The current status shows at the top right of the study. What you can do next depends on the status:

Status
Who can take part
How you move on

Draft

Nobody. The study link does not work. Use it for building and editing.

Click Move to testing.

Testing

You and your testers, through the test link and simulator. Someone who sends the study's join code is told it is in testing and then starts. Test data shows by default.

Click Move to live at the top right and confirm.

Live

Everyone you invite.

Use Manage study: Transition to Testing (pull it back to keep working on it), Pause (temporarily stop accepting responses) or Close (close to new responses).

Paused

Nobody new. People who send the join code are told the study is paused.

Resume it from the top right of the study when you are ready.

Closed

Nobody. People who send the join code are told the study has closed.

To run another round, duplicate the study. See Close a study.

Go live

1

Finish building and fix any errors

If anything would stop the study working on WhatsApp, the publish control lists each problem in plain English, question by question, with a link that takes you straight to it. Examples: a routing rule pointing at a deleted question, a multi-select with more options than WhatsApp allows, a piped question nobody could answer, or a question type a WhatsApp Flow cannot show.

Some issues are warnings rather than blocks. For example, if your WhatsApp number is not fully verified with Meta, the Build tab warns that matrix, multi-select and rating questions may not reach participants. You can still publish. See Business verification.

2

Move the study to Testing

Click Move to testing at the top right. This publishes the current version so your testers receive it straight away. Test thoroughly. See Test your study.

A draft study: the status shows Draft and the Move to testing button sits at the top right
3

Review the cost estimate

When you publish, Yazi shows what Meta is likely to charge for the WhatsApp messages, split into the broadcast invite and the survey questions. Where your study could run as a WhatsApp Flow, which is usually cheaper, there is a one-click option to switch, and anything that cannot use a Flow is called out. Estimates use real rates for many markets, including the US, Canada, the UK, South Africa, Germany, Brazil, Spain, the Netherlands, Saudi Arabia, India, Australia, New Zealand and African markets. Elsewhere, the estimate says plainly that it is a rough figure. Yazi's own fees are separate. See WhatsApp costs and the 24-hour window.

4

Confirm going live

Click Move to live at the top right. Yazi asks you to confirm before the study goes live. On some studies a review panel also lists anything worth fixing first; it never blocks you from going live.

The Go live? confirmation before a study starts taking real responses
5

Invite participants

Once you confirm, the study is published and your study link starts working for real participants. Now invite people: see Ways to invite participants.

What gets fixed at go-live

  • The starter phrase participants send to join (for example "Send to start #4F9A1") is set when the study first goes live and does not change afterwards.

  • Piping is frozen at publish. Changes to piping reach participants only when you publish again.

  • Translations refresh for any reworded questions each time you publish.

Publishing changes

Once a study has been published, editing it creates unpublished changes. You will see:

  • Publish changes appear (it only appears when you have actually changed something since the last publish).

  • The status pill read Live · not published.

Participants keep getting the last published version until you click Publish changes. On a multi-activity study, the Update Study button shows Published with a tick when every activity is up to date.

Editing a study that is already live

Changes to a live study can affect people who are partway through it, and some cannot be undone.

Change
What happens

Add a question

Only participants who have not yet reached that point will see it. People who have passed it will not be asked.

Delete a question

The answers already collected for it are deleted from your results.

Reword a question or option

Participants see the new wording after you publish. Routing rules that refer to a renamed or deleted option update automatically, and Yazi warns you before launch if a rule points at an option that no longer exists.

Change answer options on a question with responses

Check that question's chart afterwards, especially after bulk edits.

Switch between in-chat and WhatsApp Flow

Avoid this on a live study. Participants partway through can end up in the wrong format.

Version history

The clock icon at the top of the study opens version history. It shows the current draft, the live version and every earlier published version, each with Restore. Restoring copies that version (questions, options, media, logic, translations and piping) into your draft. Participants keep seeing the live version until you publish, so restoring is always safe.

When someone else is editing

If a colleague changes the same study while you have it open, you see an amber notice that someone else is editing the study and that your latest changes take preference, naming the question if you both changed the same one. Yazi merges the two sets of changes and renumbers questions rather than letting one save silently wipe out the other. The notice shows once each time you open the study.

Close a study

  • Close a study with Manage study > Close when fieldwork ends. People who message it are told it has closed. Results stay available.

  • Run another round by duplicating the study from the Dashboard.

  • Deleting a study removes it from your Dashboard, and its join links stop working. A deleted study's join code is never reused.

On once-off billing, your organisation can have only one active project at a time. If you cannot create a new study, complete or archive the current project first. See Plans, billing and usage.

The Manage study menu

On a live study, Manage study at the top right holds three actions:

A study in Testing: Move to live, with Pause and Close in the menu beside it
Action
What it does

Transition to Testing

Pulls the study back to Testing so you can keep working on it.

Pause

Temporarily stops accepting responses.

Close

Closes the study to new responses.

Limits and things to know

  • Status and publishing are linked. Moving into Testing or Live publishes; there is no way to go Live without publishing.

  • Individual activity links only work once a study is Live. In Testing, testers start at the first activity.

  • Removed questions show in old transcripts as "This question is no longer available", with the answer kept.